Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 35 results ...

Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.

Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies, Unpublished PhD Thesis, TRITA-FOB-DT, KTH Royal Institute of Technology.

Brunes, F (2015) Essays on behavioural economics and cost overuns, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.

Clausen Mork, J (2012) Dealing with uncertainty, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Eliufoo, H K (2005) Knowledge creation and transfer in construction organisations in Tanzania, Unpublished PhD Thesis, Trita-BFE, KTH Royal Institute of Technology.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden, Unpublished PhD Thesis, Trita-LWR. PHD, KTH Royal Institute of Technology.

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Gohardani, N (2014) An approach towards sustainable building, Unpublished PhD Thesis, TRITA-BYTE, KTH Royal Institute of Technology.

Högberg, L (2014) Building sustainability: Studies on incentives in construction and management of real estate, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Hedborg, S (2022) ”It’s in the between”: Inter-Project Organising in Project Ecologies, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Irumba, R (2015) Modelling of construction safety performance and housing markets in kampala, Uganda, Unpublished PhD Thesis, Trita-KTH-CEFIN-DT, KTH Royal Institute of Technology.

Jägbeck, A (1998) IT support for construction planning: A system design based on integrated information, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Karhu, V (2001) A generic construction process modelling method, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice, Unpublished PhD Thesis, Trita-IEO, KTH Royal Institute of Technology.

Laitinen, J (1998) Model based construction process management, Unpublished PhD Thesis, , KTH Royal Institute of Technology .

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.

Lindblad, H (2019) BIM in translation: Exploring client organisations as drivers for change in construction, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Lindfors, C (2003) Process oriented information management in construction, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Mirzadeh, I (2014) More roads for the money, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Nyström, J (2007) Partnering: Definition, theory and evaluation, Unpublished PhD Thesis, Trita-BFE, KTH Royal Institute of Technology.

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings, Unpublished PhD Thesis, Meddelande. Institutionen för byggvetenskap, KTH Royal Institute of Technology.

Schönbeck, P (2022) Data based configuration decisions in hospital construction projects, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications, Unpublished PhD Thesis, Trita-BKN. Bulletin, KTH Royal Institute of Technology.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Uggla, G (2021) Model and reality: Connecting BIM and the built environment, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

  • Type: Thesis
  • Keywords: automation; built environment; fabrication; laser scanning; life cycle; prefabrication; standards; training; uncertainty; industry foundation classes; neural network
  • ISBN/ISSN:
  • URL: http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-294087
  • Abstract:
    The adoption of building information modeling (BIM) in the architecture, engineering, and construction (AEC) industry is changing the way information regarding the built environment is created, stored, and exchanged. In short, documents are replaced with databases, processes are automated, and timelines become more circular with an emphasis on managing the life cycles of all manufactured objects. This has both direct and indirect consequences for the fields of geodesy and geographic information. Although geodesy and surveying have played a vital role in the construction process for a long time, new data standards and higher degrees of prefabrication and automation in the actual construction means that the topic of georeferencing must be revisited. In addition, using object oriented data structures means that semantic information must be inferred from geodata such as point clouds and images in order to adequately document existing assets. This thesis addresses the handling of 3D spatial information by analyzing different georeferencing methods and metadata used to describe the quality and characteristics of geodata. The outcomes include a recommendation for how the open BIM standard Industry Foundation Classes (IFC) could be extended to support more robust georeferencing, a suggestion that all standards and exchange formats used for the built environment should include metadata for tolerance and uncertainty, and a framework that can describe characteristics of 3D spatial data that are not covered by conventional geographic metadata. On the semantic side, this thesis proposes an image-based method for identifying roadside objects in mobile laser scanning (MLS) point clouds, and it also explores the possibilities to train neural networks for point cloud segmentation by creating training data from 3D mesh models used in infrastructure design. Overall, the thesis describes the connection between model and reality, the importance of geodesy and geodetic surveying in this context and makes contributions to both the geometric and semantic aspects of modeling the built environment.

Unger, C (2006) Industrialised house building: Fundamental change or business as usual?, Unpublished PhD Thesis, Trita-IEO, KTH Royal Institute of Technology.

Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement, Unpublished PhD Thesis, TRITA-LWR. PHD, KTH Royal Institute of Technology.

Vass, S (2017) The business value of BIM: Elaborating on content and perspective, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Zika-Viktorsson, A (2002) The industrial project. Studies of the work situation of project members, Unpublished PhD Thesis, Trita-MMK, KTH Royal Institute of Technology.